Projects

Double T Beams – AP-6 Highway

Three viaducts with separate 19 m wide carriageways, executed in phases for early commissioning, with a 10 m carriageway in each direction. circulation. Exposure class IV+F.

< ol class="">
  • Arenales Viaduct Left Causeway: light distribution 5×36 m + 3×44 m + 1×36 m
  • Arenales Viaduct Calzada Derecha: distribution of lights 8×44 m,
  • Sotillo Viaduct: light distribution 1×40 m + 2×44 m + 1×36 m + 1×40 m
  • Notable:

    • Beam type section designed specifically for this project, depth 225 cm and upper flange 150 cm, lighter than originally contemplated which allows the client to use lighter means for assembly.
    • Manufacturing and stockpiling planning adapted to the supply needs for night assembly with beam launchers and autocranes, according to structure and/or phase.
    • Design of a specific concrete dosage for the project, adapted to property requirements additional to the regulations.
    • In the Sotillo Viaduct, an experimental slab heating system was incorporated for control of frost.