News

Mission accomplished: we delivered concrete by helicopter in an inaccessible environment.

In a challenging project, we have managed to supply concrete in a difficult to access environment in the province of Tarragona. From our plant in Constantí, we have made a unique supply of Susterra concrete type HA25.

On this occasion, our concrete arrived by air, transported by helicopter to La Riba, a mountainous area that is difficult to access. The material was destined for the construction of the footing of an Endesa high-voltage electrical tower.

Logistical coordination was essential to ensure that the supply was successfully completed in an environment inaccessible by land. The complexity of the terrain and the need for precision in the supply required impeccable logistical coordination. Every step was carefully planned to ensure that the concrete arrived in perfect condition and at the right time.

The logistical and technical challenges were considerable, but thanks to the expertise and dedication of our team, we made it happen. This project demonstrates our commitment to excellence and our ability to adapt to our clients’ needs, even in the most demanding situations.

We are proud to have been part of this project and we thank Endesa and Elecnor for their confidence in us. We will continue working to offer innovative and high quality solutions to our customers.