Work
Structural reinforcement – Barcelona
Structural reinforcement was carried out for this block located on Av. Diagonal in Barcelona, where Proaccess-10 was used.
There were 3500m2 and 245m3 of Proaccess-10 to cover the entire mesh using an epoxy bonding bridge supplied by the site.
The execution was carried out by the Molins Pavements team over a period of 10 days.
The supply was made from the Molins plant in Zona Franca.
Spain
Croatia
Turkey
Portugal
Bosnia
Netherlands
Argentina
Mexico
Colombia
Uruguay
Bolivia
Brazil
Bangladesh
Lebanon
Tunisia
Angola
Cape Verde