Work
Structural reinforcement – Barcelona
Structural reinforcement was carried out for this block located on Av. Diagonal in Barcelona, where Proaccess-10 was used.
There were 3500m2 and 245m3 of Proaccess-10 to cover the entire mesh using an epoxy bonding bridge supplied by the site.
The execution was carried out by the Molins Pavements team over a period of 10 days.
The supply was made from the Molins plant in Zona Franca.
Spain
Croatia
Turkey
Portugal
Bosnia
Argentina
Mexico
Colombia
Uruguay
Bolivia
Bangladesh
Tunisia