Work
Multi-family building c/Urgell de Vilanova i la Geltrú
For the construction of this 7-storey multi-family building on Carrer Urgell in Vilanova i la Geltrú, a lightened slab (Forli system) was used.
This system is defined by a lightweight lost formwork, formed by standardised pieces (top, bottom and plate) of high-density EPS (expanded polystyrene), which allow the execution of one-way and/or waffle slabs.
It was applied on a surface area of 485m2 with an approximate use of 1385m3 of HA25 concrete for the entire project.
Spain
Croatia
Turkey
Portugal
Bosnia
Netherlands
Argentina
Mexico
Colombia
Uruguay
Bolivia
Brazil
Bangladesh
Lebanon
Tunisia
Angola
Cape Verde