Work

Installations Línia 6 Cementos Molins Industrial

Molins was in charge of supplying all the concrete required for the new Cementos Molins production line 6.

The heat exchange tower, with a height of more than 120m, was built by self-forming with continuous slipformed concrete supplied in 24-hour shifts.

It was completed in 2009, making it one of the most efficient cement plants in Europe.