Work
Industrial building – La Pobla de Claramunt
Promsa’s structural team built the structure of this building, which included foundations, tanks and retaining walls.
The structure had insulated footings for the support of prefabricated columns with the Peikko system and the Calyx system.
The tanks were waterproofed and a loading bay was also built.
Walls: 1.200m2.
Concrete: 2,900m3.
Spain
Croatia
Turkey
Portugal
Bosnia
Argentina
Mexico
Colombia
Uruguay
Bolivia
Bangladesh
Tunisia